| Unit in Feet (ft) | Notes | Currency | Rate | |
|---|---|---|---|---|
| I. CONTAINERIZED | ||||
| A. Stevedoring (Vessel Charges) | ||||
| Non Sustaining Vessel | ||||
| CY/FCL – Loaded | 20 | Box | USD | 56.28 |
| 40 | Box | USD | 73.25 | |
| 45 | Box | USD | 73.25 |
|
| CY/FCL – Empty | 20 | Box | USD | 49.55 |
| 40 | Box | USD | 59.85 | |
| 45 | Box | USD | 59.85 | |
| CFS/LCL | 20 | Box | USD | 118.92 |
| (Inbound/Outbound) | 40 | Box | USD | 166.92 |
| Shifting on Board | Box | USD | 32.13 |
|
| Shifting via Dock/Barge/Vice-Versa | Box | USD | 72.27 |
|
| Lifting and closing hatch covers,lid and support gears | Box | USD | 37.57 | |
| Foreign Transshipment | 20 | Box | USD | 81.72 |
| 40 | Box | USD | 98.72 | |
| 45 | Box | USD | 98.72 | |
| Self Sustaining Vessel |
||||
| CY/FCL – Loaded | 20 | Box | USD | 23.57 |
| 40 | Box | USD | 40.57 | |
| 45 | Box | USD | 40.57 | |
| CY/FCL – Empty | 20 | Box | USD | 16.87 |
| 40 | Box | USD | 27.13 |
|
| 45 | Box | USD | 27.13 | |
| CFS/LCL | 20 | Box | USD | 86.20 |
| (Inbound/Outbound) | 40 | Box | USD | 134.23 |
| Shifting on board | Box | USD | 13.33 | |
| Shifting via Dock/Barge/Vice-Versa | Box | USD | 34.70 |
|
| Lifting and closing hatch covers,lid and support gears | Box | USD | 37.57 | |
| Foreign Transshipment | 20 | Box | USD | 30.23 |
| 40 | Box | USD | 47.23 |
|
| 45 | Box | USD | 47.23 | |
| Cranage | Box | USD | 13.92 | |
| B. Arrastre/ Longshoring (Cargo Charges) | ||||
| CY/FCL – Import | 20 | Box | PHP | 1,620.00 |
| 40 | Box | PHP | 3,717.00 |
|
| 45 | Box | PHP | 3,717.00 | |
| CY/FCL – Export | 20 | Box | PHP | 1,323.00 |
| 40 | Box | PHP | 3,037.50 |
|
| 45 | Box | PHP | 3,037.50 | |
| C. Cranage | ||||
| Non Self Sustaining Vessel | Box | PHP | 626.25 |
|
| D. Stripping/Stuffing | ||||
| Non Self Sustaining Vessel | 20 | Box | PHP | 2,818.50 |
| 40 | Box | PHP | 4,215.00 |
|
| II. CONVENTIONAL | ||||
| A. Stevedoring (Vessel Charges) | ||||
| 1.1. General Cargo | RT | PHP | 42.38 |
|
| 1.2. Bulk Cargo | RT | PHP | 40.58 |
|
| 1.3. Heavy Lift | 5 to 20 tons | MT | PHP | 204.45 |
| Over 20 tons | MT | PHP | 248.25 |
|
| 1.4. Steel Products | MT | PHP | 35.55 |
|
| 1.5. Logs | 1000Bdft. | PHP | 116.63 |
|
| 1.6. Lumber | 1000Bdft. | PHP | 116.63 |
|
| 2. Shifting within Hatch | RT | PHP | 63.6 |
|
| 3. Shifting from Hatch to Hatch | RT | PHP | 84.75 |
|
| B. Cargo Charges (Arrastre) | ||||
| Import | ||||
| 1. General Cargo | RT | PHP | 62.85 |
|
| 2. Steel Products | RT | PHP | 73.95 |
|
| 3. Logs | 1000Bdft. | PHP | 72.9 |
|
| 4. Lumber | 1000Bdft. | PHP | 77.78 |
|
| 5. Heavy Lift | 5-15 tons | MT | PHP | 149.48 |
| Over 15 to 20 tons | MT | PHP | 248.7 |
|
| Over 20 tons | MT | PHP | 348.08 |
|
| 6. Bulk Cargo | RT | PHP | 62.85 |
|
| 7. Checking Charge (Shipside Delivery) | RT | PHP | 7.50 |
|
| C. Roll-On/Roll-Off Charges | ||||
| 1. Vessel Charges (Stevedoring) | RT | PHP | 36.45 |
|
| 2. Cargo Charges (Arrastre) | RT | PHP | 62.85 |
|
| III. MISCELLANEOUS CHARGES (Payable by whoever requested for the services) | ||||
| 1. Lifting and closing hatch covers, lid and Support gears (non-self sustaining vessel) | /hatch | PHP | 1690.5 |
|
| 2.1. B.O. Turn Over Survey | Gang/Hour | PHP | 429.00 | |
| 2.2. RECOUPING (labor cost only) Material subject to the determination of both parties based on actual usage | Gang/Hour | PHP | 184.50 | |
| 3. Equipment Rental (Excludes operator) |
||||
| 3.1. Port Crane | 25 tons capacity | /Hour | USD | 180.00 |
| 3.2. Forklift | 20 tons capacity | /Hour | PHP | 691.20 |
| 10 tons capacity | /Hour | PHP | 380.33 |
|
| 3 tons capacity | /Hour | PHP | 264.00 |
|
| 3.3. Toploader | 25 tons capacity | /Hour | PHP | 1036.88 |
| 35 tons capacity | /Hour | PHP | 1382.55 |
|
| Shifter/straddle carrier | 35 tons capacity | /Hour | PHP | 1382.55 |
| 3.4. Crane (mobile) | 100 tons capacity | /Hour | PHP | 5770.13 |
| Crane | 50 tons capacity | /Hour | PHP | 2419.35 |
| 25 tons capacity | /Hour | PHP | 1382.55 |
|
| Crane Contr. - Barge, Tango | /Hour | PHP | 845.33 |
|
| Tractor Head | /Hour | PHP | 380.33 |
|
| IV. OTHER MANPOWER CHARGES | ||||
| 1. Stand-by Charges Charges for Stand-by in any of the above conditions shall be counted by the minimum computing unit of 1/2 hour with any odd time less than 1/2 hour computed as one unit. Applies to vessel operation when labor is engaged to work but cannot work, when causes are attribute to vessel's fault under the following conditions: a. Inclement weather b. Waiting for vessel to dock c. Breakdown of vessel gear d. Waiting for cargo/truck e. Men engaged but not put to work | Gang/Hour | PHP | 649.50 |
|
| 2. Extra Labor Services a. Lashing/Shoring b. Waiting barge (lighterman) c. Cleaning/Bagging of Spillage d. Other activities as requested by the client which is outside the scope of regular stevedoring/arrastre services. | Gang/Hour | PHP | 649.50 |
|
